The sets needed to include hiding places for crew & equipment, specific lighting rigs, and even a handmade elevator that would lower into place from the ceiling to bring a cameraman to the first floor for shot 4. We began doing weekly walk-throughs of the ep 6 immediately in prep

— Mike Flanagan (@flanaganfilm) November 4, 2018